| METHOD STATEMENT FOR INSTALLATION OF CABLE AND TERMINATION WORKS |
Table of Contents
1.0. Purpose
2.0. Document/Drawing/Standards Reference
3.0. Equipment/Tools/Material Requirements
4.0. Pre-Preparation Work
5.0. Safety Precautions
6.0. Work Procedures
7.0. Forms /Checklist Records
1.0. Purpose
To explain the methodology and procedure of Installation of cable and termination works.
2.0. Document/Drawing/Standards Reference
2.1. Refer to working drawings.
2.2. Electrical Single Line Diagram.
2.3. Cable Schedule.
3.0. Equipment/Tools/Material Requirements
3.1. Impact Drill.
3.2. Hand Tools.
3.3. Hand Drill.
3.4. Hack Saw.
3.5. Measuring Tape.
3.6. Masking Tape.
3.7. Scaffolding.
3.8. Ladder.
3.9. Marker Pen.
3.10. Cable Cutter.
3.11. Flexible Conduit, Cable Glands, Cable Lugs, and Coloured Sleeves.
3.12. Drum Support with hydraulic jack.
4.0. Pre-Preparation Work
4.1. Ensure that site access and location are clear and free of debris and obstruction.
4.2. Marked out all relevant positions or locations on the working drawings for the installation to proceed.
5.0. Safety Precautions
5.1. Barricade all work areas relating to the works if required.
5.2. Wear Proper Protection Equipment (PPE) for personal safety.
5.3. Identify the proper voltage to use, where hand tools and equipment are concerned.
5.4. All electrical tools and equipment shall be properly on earth.
6.0. Work Procedures
6.1. Check the Working drawings, Electrical Single-Line Diagram, and Cable Schedule to identify the cable routing and type of cable sizes required.
6.2. Identify all the cable lengths required for cable laying and termination for the various locations on drawings.
6.3. Support the cable drums with hydraulic jacks and supports.
6.4. With the aid of a suitable marker pen write down the Equipment Number, Cable Size & Type, and Cable Run Length on the masking tape.
6.5. Next, mark the length of the cable. Affixed one piece of the masking tape at the beginning of the cable.
6.6. Record the Equipment Number, Cable Size and Type, and Cable Run Length in an appropriate form.
6.7. Now, unroll the cable drum and lay the cables on the cable trays.
6.8. Cut the cable to the required length after the cable was laid. Marked the other end of the cable with the piece of masking tape and affixed it at the position where the cable was cut at the point.
6.9. Secure the cable that was laid by temporarily affixing it with wires. When all required cables are completely laid, secure the cables permanently to the cable tray with cable ties.
6.10. Terminate the cables to panels with suitable cable glands, cable adapters, cable lugs, and coloured sleeves, where required.
7.0. Forms /Checklist Records
7.1. Checklist for Cable Installation and Termination.
7.2. Risk Assessment