METHOD STATEMENT FOR INSTALLATION OF CABLE LADDER WORKS
The Method Statement for Installation of Cable Ladder Works by RaMsProZone provides a detailed, editable, and ready-to-use guide in Word format. It outlines safe and efficient procedures for cable ladder installation, ensuring compliance with HSE standards, and is tailored for HSE professionals, project managers, engineers, and supervisors.
Table of Contents
1.0. Purpose
2.0. Document/Drawing/Standards Reference
3.0. Equipment/Tools/Material Requirements
4.0. Pre-Preparation Work
5.0. Safety Precautions
6.0. Work Procedures
7.0. Forms /Checklist Records
1.0. Purpose
To explain the methodology and procedure for the installation of Cable Ladders.
2.0. Document/Drawing/Standards Reference
2.1. Working Drawings.
3.0. Equipment/Tools/Material Requirements
3.1. Impact Drill.
3.2. Hand Tools.
3.3. Hand Drill.
3.4. Hack Saw.
3.5. Measuring Tape.
3.6. Fiber Cutter.
3.7. Scaffolding.
3.8. Ladder.
3.9. Marker Pen.
3.10. Cable Ladder & Fittings.
3.11. Brackets, Stud-rods, bolts, washers, & nuts.
3.12. Expansion bolts.
4.0. Pre-Preparation Work
4.1. Ensure that site access and location are clear and free of debris and obstruction.
4.2. Marked out all relevant positions or locations on the working drawings for the installation to proceed.
5.0. Safety Precautions
5.1. Barricade all work areas relating to the works if required.
5.2. Wear Proper Protection Equipment (PPE) for personal safety.
5.3. Identify the proper voltage to use, where hand tools and equipment are concerned.
5.4. All electrical tools and equipment shall be properly on earth.
6.0. Work Procedures
6.1. Refer to the Working drawings and mark out the ladder bracket support position on the Working Drawings.
6.2. Marked out the position of Cable Ladder bracket supports at the slab.
6.3. Drill the relevant holes for expansion bolts at the ceiling.
6.4. Install the expansion bolts and bracket supports. Tighten to the required torque where necessary.
6.5. Mount cable ladder and fittings with bolts, nuts, and washer.
6.6. Touch up the edges of the cable ladder with paint.
7.0. Forms /Checklist Records
7.1. Checklist for Cable Ladder Installation
7.2. Risk Assessment