RISK ASSESSMENT FOR LIFTING AND LOADING STEELWORK & EQUIPMENT

RISK ASSESSMENT FOR LIFTING AND LOADING STEELWORK & EQUIPMENT
RISK ASSESSMENT FOR LIFTING AND LOADING STEELWORK & EQUIPMENT

RaMsProZone offers free, editable risk assessments in Word format for lifting and loading steelwork and equipment. Tailored for HSE professionals, project managers, engineers, and supervisors, these ready-to-use documents ensure compliance with safety standards, identify potential hazards, and provide control measures to mitigate risks during operations. Simplify your safety planning with RaMsProZone' s comprehensive, user-friendly resources.

1.0. Hazard

1.1. Crushing and cuts

1.2. Injury from falling materials

2.0. Who could be harmed and how?

1.3. Banksman 

1.4. Slingers 

1.5. Site Operatives 

1.6. General Public

3.0. Existing Risk Control Measures/Recovery Measures

3.1. Only certificated lifting gear to be used,

3.2. Lifting gear is to be checked by the slinger/signaler.

3.3. CPCS-qualified slinger signaler to be used.

3.4. When slinging the load, check chains for positioning and load slightly lifted to ensure correct balance before the main lift.

3.5. Loading/offloading should only take place where safe to do so.

3.6. Safe Working Load of lifting appliances and lifting tackle must never be exceeded.

3.7. Only slingers to sling loads.

3.8. Only Banksman to give instructions to crane or rig operators.

3.9. Keep hands and feet clear of load during lifting or lowering operations.

3.10. Always wear helmets, gloves, high visibility vests, and safety boots during these operations.

3.11. Suitable size packers must be used below each load when lowering off.

3.12. When lifting steelwork with the rig, the safety chain and chain lock must be securely fixed and checked before lifting.

3.13. Lifting equipment is to be checked regularly for wear and tear and replaced as required.

3.14. Ensure the slinger inspects connections before lifting.

3.15. Exclusion Zone to be in place. Only essential personnel to enter. Once load slung all personnel exit the exclusion zone

3.16. Pre-inspections of Lifting Gear are to be recorded on


Download File Now

Post a Comment

0 Comments