| METHOD STATEMENT FOR INSTALLATION OF CABLE TRAY WORKS |
Table of Contents
1.0. Purpose
2.0. Document/Drawing/Standard Reference
3.0. Equipment/Tools/Material Requirements
4.0. Pre-Preparation Work
5.0. Safety Precautions
6.0. Work Procedures
7.0. Forms /Checklist Records
1.0. Purpose
To explain the methodology and procedure for Cable Trays.
2.0. Document/Drawing/Standard Reference
2.1. Working drawings.
2.2. Code of practice for electrical Installation
3.0. Equipment/Tools/Material Requirements
3.1. Hand Tools
3.2. Impact Drill
3.3. Hand Drill
3.4. Hack Saw
3.5. Measuring Tape
3.6. Fiber Cutter
3.7. Scaffolding
3.8. Ladder
3.9. Marker Pen
3.10. Tray and Fittings
3.11. Brackets, Stud rods, Bolts, Nuts, and Washers
3.12. Expansion Bolts
4.0. Pre-Preparation Work
4.1. Ensure that site access and location are clear and free of debris and obstruction.
4.2. Marked out the relevant positions or locations on the working drawings for the installation to proceed.
5.0. Safety Precautions
5.1. Barricade all work areas relating to the works if required.
5.2. Wear Proper Protection Equipment (PPE) for personal safety.
5.3. Identify the proper voltage to use, where hand tools and equipment are concerned.
5.4. All electrical tools and equipment shall be properly on earth.
6.0. Work Procedures
6.1. Refer to the Working drawings and mark out the tray bracket support position.
6.2. Marked out all positions and locations of tray bracket support on the walls and ceiling.
6.3. Drill all the relevant holes for expansion bolts on walls and ceilings.
6.4. Mount expansion bolts and bracket supports to walls and ceilings. Tightened to required torque where necessary.
6.5. Install the trays and fittings with bolts and nuts.
6.6. Touch up all cut edges with paint.
7.0. Forms /Checklist Records
7.1. Checklist for Cable Tray Installation.