| METHOD STATEMENT FOR INSTALLATION OF CABLE TRUNKING WORKS |
The Method Statement For Installation Of Cable Conduit Works By RAMSPROZONE Provides A Detailed, Editable, And Ready-To-Use Guide In Word Format. It Outlines Safe And Efficient Procedures For Cable Conduit Installation, Ensuring Compliance With HSE standards. Ideal For Hse Professionals, Project Managers, Engineers, And Supervisors To Streamline Project Execution And Maintain Safety Protocols.
Table of Contents
1.0. Purpose
2.0. Document/Drawing/Standard Reference
3.0. Equipment/Tools/Material Requirements
4.0. Pre-Preparation Work
5.0. Safety Precautions
6.0. Work Procedures
7.0. Forms /Checklist Records
1.0. Purpose
To explain the methodology and procedure of installation for Cable Conduits for Cable Trunking.
2.0. Document/Drawing/Standard Reference
2.1. Working Drawings.
2.2. Code of practice for electrical Installation
3.0. Equipment/Tools/Material Requirements
3.1. Hand Tools.
3.2. Concrete Drill.
3.3. Hand Drills.
3.4. Hack Saws.
3.5. Measuring Tapes.
3.6. Fiber Cutter.
3.7. Scaffolding.
3.8. Marker Pen.
3.9. Trunking and Fittings
3.10. Brackets, Threaded Bolts & Nuts.
4.0. Pre-Preparation Work
4.1. Ensure that site access and location are clear and free of debris and obstruction.
4.2. Marked out all relevant positions or locations on the working drawings for the installation to proceed.
5.0. Safety Precautions
5.1. Barricade all work areas relating to the works if required.
5.2. Wear Proper Protection Equipment (PPE) for personal safety.
5.3. The proper ladder should be secured by tight rope/wire and, a proper roller clamp on the suitable hook.
5.4. All electrical tools and equipment shall be properly on earth.
5.5. Proper scaffolding is to be provided while working at the heights.
6.0. Work Procedures
6.1. Refer to the Working drawings and mark out the trunking bracket support position on the Working Drawings.
6.2. Marked all positions and locations of trunking bracket supports on the walls and ceiling.
6.3. Drill all the relevant holes for anchor bolts or inserts on walls and slab areas.
6.4. Mount the supporting bracket or threaded rod by making use of the anchor bolt or insert.
6.5. Measure, mark, and cut the cable trunking according to the shop drawing and site condition.
6.6. Remove the sharp cutting edges with a smooth file.
6.7. Install the cable trunking together with the necessary factory-made 90-degree elbow, tee, or reducer joints accordingly.
6.8. Install all the points with copper earth links to maintain the earth's continuity
7.0. Forms /Checklist Records
7.1. Checklist for Cable Trunking Installation.