RAMSPROZONE Documents offers a detailed Risk Assessment for Pile Cutting and Concrete Casting, designed for HSE professionals like project managers, engineers, and supervisors. These free, editable, and ready-to-use Word documents ensure compliance with safety standards, covering hazards, risks, and control measures. Perfect for streamlining site safety management, the resource helps mitigate risks effectively while maintaining productivity. Download now to simplify your HSE documentation needs!

1.0. WORK ACTIVITY 

1.1. Preparation and going down to the trench

1.2. Marking the piles by using the grinder.

1.3. Pile hacking manually by using the hammer and a chisel

1.4. Dispose of the waste-hacking concrete piece from the trench and carry the sandbags to the trench

1.5. Making the concrete with Mixer

1.6. Carry and pour the concrete

1.7. General items before leaving the workplace

2.0. HAZARDS 

2.1. Slip, trip and fall

2.2. Dust Pollution, Electrical Hazards, and the grinding wheel can be broken.

2.3. Flying objects. The hammer handle can be broken. The worker may get caught between.

2.4. Slip, trip, and fall from the ladder. Fall from height Falling object

2.5. Dust pollution Noise pollution. Get caught between the belts.

2.6. Slip, trip, and fall. The concrete can be spilled on the body.

3.0. CONSEQUENCES

3.1. The workers may get injuries. Equipment failure

3.2. The workers may get serious injuries. The cost of huge financial

3.3. The worker may get a serious injury. The cost of huge financial

3.4. The worker may get injured. Equipment failure. Low back pain

3.5. The worker who operates the mixer may get a serious injury. Permanent disability

3.6. The worker may get injured. Low back pain

3.7. The other operative may get the injury. First aid case

4.0. EXISTING RISK CONTROL 

4.1. All the walkways must be cleared. Use the ladder for access and the egress. Use the ladder safety; “3- Point Contact”.

4.2. All the electrical tools and the cables must be checked before use. All the workers must wear the relevant PPE (Face protection, Dust Mask, Proper Hand Gloves, etc…)

4.3. Use the relevant PPE (Face protection, eye protection, proper hand gloves, etc…). The co-worker must use the correct tools and check before use. All the tools must be used in good condition.

4.4. All the walkways must be cleared at all times. Every worker must wear the proper PPE. Do not allow the overload (Maximum 25kg).

4.5. Workers must wear the proper PPE (Dust mask, ear protection, proper hand gloves, etc…). The machine must have a safety guard and be checked by the supervisor before use.

4.6. The walkway must be cleared. Must wear the proper PPE. The supervisor must arrange the manpower when pouring the concrete.

4.7. Do not leave and keep the materials on the walkways. Maintain daily housekeeping.

5.0. Additional Risk Control

5.1. Do not keep the materials on the walkways and maintain good housekeeping before starting to work. The involved workers must attend the proper training. 

5.2. The electrical equipment must be inspected by the electrician. Make sure to check the cutting wheel (RPM) must be greater than the grinder (RPM). All grinding equipment is used in good condition.

5.3. Do not modify any tools. All the involved workers must be trained and skilled workers. Focus on the job, pinch point, and line of fire. After hacking the pile, make sure to cover the rebar with caps.

5.4. Every involved worker must be trained in manual handling.

5.5. The machine must be inspected before use. Follow the machine guard safety rules and regulations. Related activities PPE must be worn at all time

5.6. Every worker must keep good communication with each other when giving the concrete tray from one to one.

5.7. Make the hard barrier and display the warning signs around the trench. Make sure to check the rebar is covered with the cabs.