HAZARD IDENTIFICATION AND RISK ASSESSMENT IN CONSTRUCTION INDUSTRY

HAZARD IDENTIFICATION AND RISK ASSESSMENT IN CONSTRUCTION INDUSTRY
HAZARD IDENTIFICATION AND RISK ASSESSMENT IN CONSTRUCTION INDUSTRY

Hazard Identification and Risk Assessment (HIRA) in the construction industry, by RaMsProZone, is a systematic process to identify potential hazards, evaluate risks, and implement control measures to ensure worker safety and project efficiency. It involves analyzing tasks, equipment, and environments to prevent accidents, injuries, and delays. RaMsProZone emphasizes proactive risk management, compliance with safety regulations, and fostering a safety culture to protect workers and enhance productivity in construction projects.

1.0. Activity

1.1. Shifting of structural materials from the yard to the blasting/painting area and back to the fabrication yard (By using hydra, crane & trailer)

1.2. Manual Material Handling

1.3. Gas cutting Activity Storage, Handling & use of Gas Cylinders at the site.

1.4. Grinding Work

1.5. Welding Work

2.0. Hazard / Risk

2.1. Unauthorized Operation of Vehicle.

2.2. Carrying Unauthorized Passengers

2.3. Intoxicated Driving

2.4. Hazards during manual materials handling.

2.5. Pinching of leg/hands while handling of materials.

2.6. Improper stacking of Material.

2.7. Unauthorized

2.8. Operation of crane.

2.9. Inadequate space for access/egress.

2.10. Improper illumination.

2.11. Improper unloading process, damage of the Cylinder resulting in fire & explosion, and injury while handling.

2.12. Improper Storage – Untied cylinders.

2.13. Fire, and burn injury while using at the site.

2.14. Struck by grinding wheel.

2.15. Breaking of the wheel.

2.16. Poor electrical connection.

2.17. Electrocution due to improper electric Connection.

2.18. Welding fumes/Health hazard.

2.19. Fire hazard due to welding spark.

3.0. Existing Control Measures

3.1. Area Survey to be done before moving the crane

3.2. Designated persons are only allowed to travel in the cabin of the trailer/truck.

3.3. Don’t allow the person to lift more than 30 kg for materials shifting from one place to another. Provide

3.4. Trolley for materials shifting. The person handling the material should be physically fit to do work.

3.5. Use hand gloves during material handling. All Mandatory PPEs shall be used at the site.

3.6. Medical Fitness of Crane operators shall be checked.

3.7. The space for access &egress should be proper, Clear & adequate.

3.8. Cylinders should be kept in an upright direction only.

3.9. Provide a flashback arrestor on each side of the gas-cutting set.

3.10. All the grinding machines shall be used with a wheel guard.

3.11. Check the expiration date of the grinding wheel and use the approved product of the wheel.

3.12. Welding goggles shall be provided to the welder’s helper for eye protection.

3.13. The area shall be cleared of Flammables and Combustibles before commencing welding.



Download File Now